Contact Us

If you still have questions or prefer to get help directly from an agent, please submit a request.
We’ll get back to you as soon as possible.

Please fill out the contact form below and we will reply as soon as possible.

  • Contact Us
English (UK)
US English (US)
GB English (UK)
FR French
  • Home
  • Ostara Original
  • Desktop
  • Work Orders
  • Work Order Process Flow
  • Agent Actions - Reactive, Quote, PPM, Audit

Link Work Order > Link Existing

Written by Ostara Systems

Updated at October 28th, 2025

Contact Us

If you still have questions or prefer to get help directly from an agent, please submit a request.
We’ll get back to you as soon as possible.

Please fill out the contact form below and we will reply as soon as possible.

  • Nexus
    Sign in Page Dashboard Portal Tiles
  • Mobile
    Work Orders Assets Authorisations Settings
  • Ostara Original
    Desktop Portal
+ More

It may be the case that a series of Work Orders need to be linked so that they can all be tracked together. If this is the case the User can link a Work Order to an existing Work Order. This will show in the Events page on the helpdesk along with the Work Order number it is now linked with.

  1. To "Link Existing Work Order > Link Existing > Work Order Number" select it from the Agent Actions list.
  2. Enter the Work Order number you wish to link it to and click "OK".

    Note: When linking a Reactive Work Order to a PPM, the link type will default to "Remedial".
connect order

Was this article helpful?

Yes
No
Give feedback about this article

Related Articles

  • Work Order Messages
  • Generating PPM Work Orders Introduction
  • Emailing PPM Work Orders
  • ETA Provided
Expand